Bulgartransgaz EAD performed emergency repair works on a part of the gas pipeline in the section from valve assembly Vetrino to valve assembly Hrabrovo.
Thanks to the prompt reaction and the efforts by the employees of Bulgartransgaz EAD, the repair works were completed and the transmission of natural gas to Serbia and Hungary will be resumed at 24:00 on November 2, 2021. At the same time, the transmission to Romania will be increased.