PLANNED CAPACITY UNAVAILABILITY AT KULATA (BG)/ SIDIROKASTRON (GR) (ENTRY/EXIT)

Event start: 20.04.2026, 7:00 EET

Event end: 24.04.2026, 7:00 EET

Available capacity during the event in both directions of IP Kulata (BG)/Sidirokastron (BG) = 0 kWh/d

MORE DETAILS ABOUT THE EVENT ARE PUBLISHED ON ENETSOG TP *

 *According to Article 4(1) and Article 4a of REMIT II (Regulation (EU) 2024/1106 amending regulations (EU) № 1227/2011 and (EU) 2019/942), market participants shall disclose the inside information through inside information platforms authorized by ACER.

Information on scheduled maintenance activities along Bulgartransgaz's transmission system

 

ПЛАНИРАНО ПРЕКЪСВАНЕ НА КАПАЦИТЕТА НА КУЛАТА/СИДИРОКАСТРО (ВХОД / ИЗХОД)

Начало: 20.04.2026, 7:00 EET

Край: 24.04.2026, 7:00 EET

Разполагаем капацитет по време на събитието в двете посоки на IP Кулата / Сидирокастро = 0 kWh/d

ПОВЕЧЕ ИНФОРМАЦИЯ ЗА СЪБИТИЕТО Е ПУБЛИКУВАНА НА ENTSOG TP *

 *Съгласно Член 4(1) и Член 4а на REMIT II (Регламент (ЕС) 2024/1106 за изменение на регламенти (ЕС) №1227/2011 и (ЕС) 2019/942), участниците на пазара разкриват вътрешна информация чрез платформи за вътрешна информация, оторизирани от ACER. 

Информация за планираните ремонтни дейности по газопреносната система на "Булгартрансгаз" ЕАД