In connection with commissioning of infrastructure related to the Vertical Gas Corridor project, the technical capacity for natural gas transmission from Greece to Bulgaria, at IP Kulata (BG) /Sidirokastron (GR) (entry) (21Z000000000020C), will increase to 93 009 443 kWh/day effective 1 October 2026. The final phase of the project is expected to be completed in January 2027 and the technical capacity will be increased up to 102 825 300 kWh/day. The relevant available yearly capacity products for the next gas years will be offered in the annual auctions for firm capacity products scheduled for 6 July 2026.
In connection with commissioning of infrastructure related to the Vertical Gas Corridor project, the technical capacity for natural gas transmission from Bulgaria to North Macedonia, at IP Kyustendil (BG) /Zidilovo (MK) (exit) (21Z000000000137S), will increase from 33 320 634 kWh/day to 38 732 348 kWh/day during 2027. The relevant available yearly capacity products for the next gas years starting from 2027/2028 will be offered in the annual auctions for firm capacity products scheduled for 6 July 2026.
In connection with commissioning of infrastructure related to the Vertical Gas Corridor project, the technical capacity for natural gas transmission from Bulgaria to Romania, at IP Kardam (BG) /Negru Voda 1 (RO) (exit) (21Z000000000159I), will increase from 159 260 238 kWh/day to 296 796 409 kWh/day during 2027. The relevant available yearly capacity products for the next gas years starting from 2027/2028 will be offered in the annual auctions for firm capacity products scheduled for 6 July 2026.
DETAILS ABOUT THE EVENT ARE PUBLISHED ON ENETSOG TP *
*According to Article 4(1) and Article 4a of REMIT II (Regulation (EU) 2024/1106 amending regulations (EU) № 1227/2011 and (EU) 2019/942), market participants shall disclose the inside information through inside information platforms authorized by ACER.