Points Requirements of Chapter 3 of Annex I to Regulation (EU) 2024/1789
3.1.2 (a)
Description of the different services offered and their charges
3.1.2 (b)
Offered transportation contracts
3.1.2 (c)
Network code and the standard conditions outlining the rights and responsibilities of all network users
3.1.2 (c) (2)
Specification of relevant gas quality parameters

Natural gas quality characteristics (Annex No. 2 to Harmonized contract for access and transmission, General terms and conditions to contract for access and transport of natural gas through the gas transmission networks of Bulgartransgaz EAD, point 4, page 5)

Natural gas quality certificate

Natural gas quality indicators

Methodology on converting measured natural gas quantities from volume units into energy units

3.1.2 (c) (3)
Information on pressure requirements
3.1.2 (c) (4)
Procedure in the event of an interruption of interruptible capacity

Stop and limitation of natural gas transmission by the operator. Interruption of interruptible capacity (Annex No. 2 to Harmonized contract for access and transmission, General terms and conditions to contract for access and transport of natural gas through the gas transmission networks of Bulgartransgaz EAD, point 13, page 16)

3.1.2 (d)
Harmonized procedures applied when using the transmission system, including the definition of key terms
3.1.2 (e)
Provisions on capacity allocation, congestion management and anti-hoarding and reutilisation procedures
3.1.2 (f)
Rules applicable for capacity trade on the secondary market

Secondary capacity transactions (Harmonized contract for access and transmission of natural gas through the gas transmission networks of Bulgartransgaz EAD, point 7, page 5)

3.1.2 (g)
Rules on balancing and methodology for the calculation of imbalance charges
3.1.2 (h)
Flexibility and tolerance levels included in transportation and other services without separate charge, as well as any flexibility offered in addition to this and the corresponding charges

Provision of a linepack flexibility service to network users, envisaged by Chapter IX of Regulation (EU) № 312/2014 is not offered at the moment. Due to the suspension of the interim measures under Regulation (EU) № 312/2014, tolerance under the requirements of Article 50 of Regulation (EU) № 312/2014, is not applicable as well.

3.1.2 (i)
Description of the gas system of the transmission system operator and its relevant points of interconnection
3.1.2 (j)
Rules applicable for connection to the system
3.1.2 (k)
Information on emergency mechanisms

Preventive Action Plan and Emergency Action Plan according to Art. 4 , § 5 of Regulation (EC) № 994/2010 of the European Parliament and Council of 20.10.2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC (Regulation) and Art. 72a, para 1 of the Energy Act.

Ordinance No. 10 of 9 June 2004 on the procedure for introducing limiting regime, suspension or restriction of production or supply of electricity, heat and natural gas - SG No. 63/20.07.2004 (only in Bulgarian)

3.1.2 (l)
Procedures agreed upon by transmission system operators at interconnection points, of relevance for access of network users to the transmission systems concerned, relating to interoperability of the network, agreed procedures on nomination and matching procedures and other agreed procedures that set out provisions in relation to gas flow allocations and balancing, including the methods used
3.1.2 (m)
Methodology used to calculate the technical capacity
3.3
Actual and historical information for the technical capacity, total interruptible capacity, booked and available firm and interruptible capacity. Nominations and renominations. Actual physical flows
3.3 (4)
Measured values of the gross calorific value and the Wobbe index
3.3 (1) (f-g)
Interruptions information
3.4 (1)
3.4 (2)
Information on secondary trading

Harmonized conditions for secondary capacity transactions (Harmonized contract for access and transmission of natural gas through the gas transmission networks of Bulgartransgaz EAD, point 7, page 5)

Aggregated information about the secondary market transactions at the IPs of Bulgartransgaz

3.4 (3)
Balancing services

„Regarding the balancing service of its system, Bulgartransgaz provides to each network user, for each balancing period, its specific preliminary imbalance volumes and cost data per individual network user, by the 4th day of the month after the end of the reporting month.

The provision of this information respects confidentiality of commercially sensitive information. The relevant information is accessible to each network user via its individual user account in the information system Commercial Dispatching System (CDP).

3.4 (4)
Flexibility services, other than tolerances

Currently Bulgartransgaz EAD do not offer flexibility services.

3.4 (5)
Current and forecasted aggregate imbalance position of the network users per balancing zone

Transmission system operators shall publish, per balancing zone, the amount of gas in the transmission system at the start of each gas day and the forecast of the amount of gas in the transmission system at the end of each gas day. The forecast amount of gas for the end of the gas day shall be updated on an hourly basis throughout the gas day. If imbalance charges are calculated on an hourly basis, the transmission system operator shall publish the amount of gas in the transmission system on an hourly basis. Alternatively, transmission system operators shall publish, per balancing zone, the aggregate imbalance position of all users at the start of each balancing period and the forecast of the aggregated imbalance position of all users at the end of each gas day. If the national regulatory authority is satisfied that such information could give room to potential abuse by network users, it may decide to exempt the transmission system operator from this obligation.

Current and forecasted aggregate imbalance position of the network users per balancing zone

Operational limits and exploitational zones of the linepack

3.4 (6)
Instruments for calculating tariffs

 

REGULATION (EU) 2024/1789

REGULATION (EU) 2024/1789 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 13 June 2024 on the internal markets for renewable gas, natural gas and hydrogen, amending Regulations (EU) No 1227/2011, (EU) 2017/1938, (EU) 2019/942 and (EU) 2022/869 and Decision (EU) 2017/684 and repealing Regulation (EC) No 715/2009 (recast)

 

REGULATION (EC) No 715/2009

REGULATION (EC) No 715/2009 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 13 July 2009 on conditions for access to the natural gas transmission networks and repealing Regulation (EC) No 1775/2005

COMMISSION DECISION of 10 November 2010 amending Chapter 3 of Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks

COMMISSION DECISION of 24 August 2012 on amending Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks

COMMISSION DECISION (EU) 2015/715 of 30 April 2015 amending Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks